A more detailed description and additional information about these projects can be found on our website at: http://townofgreenville.com/projects.php or by contacting our office at (920)757-7276.
Streets
- Greenwood Road Urbanization (STH 15 - Parkview Dr)
- An existing conditions survey is currently being performed. Following this, a conceptual design will be drafted.
- The project is planned to be constructed in 2021.
- South Creek Drive (School Rd-Molly Marie Ct)
- Construction is scheduled to begin the week of June 8
- Spring Road Pulverize and Pave (North Rd-Julius Dr)
- Week of 6/1/20: Continue with common road excavation and begin culvert installation and ditch cleaning.
- Week of 6/8/20: Continue with culvert installation and ditch cleaning. Begin concrete curb and gutter installation and fine grading the roadway.
- 6/9/2020: The contractor will be performing a large culvert replacement and will be shutting down the roadway to traffic at this location between Linda Lou Drive and Terrace Drive. The culvert is located approximately 825’ East of Linda Lou Drive and 1,550’ West of Terrace Drive. This work will be performed during normal construction hours during the day and will be opened back up to traffic immediately after the culvert is installed.
Water & Sewer
- Hydrant Exercising and Flushing began the week May 11 and will continue throughout the next few months.
Parks, Recreation & Forestry
- Greenville Sports Complex
- Rettler Corporation has been contracted to design and engineer a new entrance road to the property. This new entrance road is consistent with the Master Plan for the park and will provide a safer access to the park from Hwy 96. Construction is planned to be completed in 2020.
- The Field of Dreams Referendum Steering Committee brought a formal recommendation to the Town Board on May 18, 2020 to hold an advisory referendum with the August election regarding the development of Phase 1 of the Field of Dreams Property. The Town Board approved the resolution to hold the advisory referendum.
- Street tree planting
- Street tree planting was completed by Srb’s Trees the week of May 11, 2020. Town staff will be installing the irrigation bags within the next couple of weeks.