Wednesday, April 10, 2019

Julius Drive Reconstruction to Start Week of April 29th


Julius Drive (Spring Road to School Road) is scheduled to be closed for reconstruction on Monday, April 29 through the end of August, weather permitting. This closure will be to all thru traffic, residents that live in the project limits or in the adjacent subdivisions will be able to access their property during the closure. At a minimum the contractor is to provide access to the project from either the north side (Spring Road) or the south side (School Road). Certain properties will have limited access during the replacement of private culverts or grading or paving of driveways.  Access will always be maintained for emergency services, refuse collection and mail delivery. 

The reconstruction will include the full reconstruction of road base, asphalt bituminous pavement, the widening of travel lanes, a five-foot paved bicycle lane and improved cross slopes for roadside ditches.

A Pre-Construction Public Informational Meeting will be held at the Greenville Fire Station (W6895 Parkview Drive) from 5pm to 6pm on Thursday, April 25. Town staff, engineer and contractor will be in attendance at this meeting to discuss any concerns that you may have about access or the details of the project.

For more information, please contact the Department of Public Works at (920) 757-7276.