Friday, November 13, 2020

The Parks, Recreation & Forestry Department's Feature Friday

Each Friday, the Parks, Recreation and Forestry Department features something new for residents and visitors to learn more about. This week, we want to tell you a little more about Jennerjohn Park.

Jennerjohn Park is a 25 acre park located in the heart of Greenville. As one of Greenville’s most popular parks, it has a lot to offer! It’s existing facilities include a pavilion, grills, picnic tables, casual play baseball field, tennis courts, off street parking, playground, Heritage Fountain, natural trails, and access to the recreational trail system. In the winter, there’s a sledding hill, ice skating rink and cross country ski trails.

At almost 11 feet tall, the Heritage Fountain has been a focal point at Jennerjohn Park since it was installed in 2004. It is made of solid granite and features a soaring eagle at the top. The brick plaza surrounding the fountain includes memorial bricks and benches, stone walls, and beautiful landscaping. Though there is no swimming, standing, or throwing money into the fountain, it is still the perfect place to relax and enjoy some nature!

Just south of the Heritage Fountain, you’ll find the playground. The playground at Jennerjohn Park is the biggest, and probably most popular, playground in Greenville. There are three different playground areas to choose from. The play areas total approximately 9,800 square feet and include equipment to slide, climb, ride, and swing. You will also find diggers and a metal fire truck for “driving” and climbing in the sand area.

To the north of the tennis courts is a beautiful prairie that surrounds a stormwater pond. A grass walking trail runs through the prairie and around the pond with a wood chipped segment through a wooded area. The prairie was planted 5 years ago and is well established, bringing many benefits to the area.

From recreation to leisure, Jennerjohn park has something to offer everyone! What’s your favorite thing to do there?


To see more photos of today's Feature Friday or to see more posts like this, check out the Parks & Recreation Facebook page at https://www.facebook.com/greenvilleparkandrec/

Tuesday, November 10, 2020

Greenville to Begin Search for New Administrator

Joel Gregozeski, Town Administrator since July 2017, will leave at the end of the month to take a similar post with a community in Brown County.  Gregozeski will be with the Town until November 29, 2020.   

As the chief appointed administrative officer, Gregozeski has been responsible for planning, organizing, coordinating, and directing the day to day operations and activities of the Town of Greenville.

The Town Board will be reviewing the vacancy left by Mr. Gregozeski and will determine a course of action over the coming weeks.   The Board selected Public Administration Associates of Whitewater to coordinate an executive search and provide interim administrative services during the transition period.

Friday, November 6, 2020

The Parks, Recreation & Forestry Department's Feature Friday

Each Friday, the Parks, Recreation and Forestry Department features something new for residents and visitors to learn more about. This week, we want to tell you about one of our most well-known parks – the Greenville Lions Park.

Lions Park is a 57 acre park located at the southern edge of the developed portion of Greenville. It’s commonly known for its large scale community gatherings but this mostly developed, community sized park has a lot to offer the general public too!

The park’s existing facilities include off street parking, a large indoor barn pavilion and three open shelter spaces. Two out of the three shelters include restrooms and a kitchen. These shelters, along with the barn, can be rented in the warmer months. The current recreational amenities include a playground, archery range, vast open play space, nature/walking trails, free little library, Born Learning Trail activities, an amphitheater, and recreational trail system access.

At the beginning of 2018, the Greenville Lions Club began development of the final portion of the park. This work is ongoing but, when complete, will include a pavilion and play space, basketball courts, volleyball courts and tennis courts. The existing skate park at Community Park will also be relocated to this area of Lions Park. There will also be additional parking made available in front of this newly developed portion. This project is being funded and managed entirely by the Greenville Lions Club.


To see more photos of today's Feature Friday or to see more posts like this, check out the Parks & Recreation Facebook page at https://www.facebook.com/greenvilleparkandrec/

Wednesday, November 4, 2020

Greenville Voters Support Incorporation - November 4, 2020

On Tuesday, November 3, 2020 the Town of Greenville Incorporation Referendum was approved by the voters residing in the incorporating area of the Town with the following vote counts:

Incorporation Referendum Results:

  • For a village - 3,952 
  • Against a village - 1,643

Total Votes: 5,595

The referendum was approved with 66% of the voters in favor of the incorporation. 

Clerk Wendy Helgeson and the Municipal Board of Canvassers will be completing the final election canvass, with the results being submitted to the Outagamie County Clerk of Courts.  From there the results are being submitted to the Secretary of the Department of Administration for final certification.

 

Tuesday, November 3, 2020

Greenville Project Update


The projects detailed below are large scale projects happening in addition to our regular operations. Their completion may be scheduled to be done by town staff or the services may have been contracted with a third party. Please remember that all of the information and time lines are weather dependent and subject to change at any time.

A more detailed descriptions, additional information or photos of completed projects, visit our website at: http://townofgreenville.com/projects.php or contact our Public Works office at (920)757-7276.

Streets

  • Greenwood Road Urbanization (STH 15 - Parkview Dr)
    • An existing conditions survey has been performed and a conceptual design is being drafted.
    • The project is planned to be constructed in 2021

Stormwater

  • Ditching Maintenance
    • Everglade Road: south side of the roadway, from just east of the post office 350 linear feet to a private driveway. This maintenance will remove the sediment that currently fills the ditch causing water and sediment to enter onto the roadway surface during rain events. It will also help to prevent winter ice issues from forming on the road.
    • Lily of the Valley/Maple Terrace/Buttercup Court: approximately 1900 linear feet of ditches will be maintained. This maintenance will remove 6-12 inches of sediment and vegetation from the bottom of the ditch. This prevents adequate stormwater conveyance during storm events.


Water & Sewer

  • STH 15 Utility Relocates
    • Work began the week of September 28, 2020
    • Utility relocates along STH 15 between Julius Drive and Lily of the Valley Drive.
    • Dorner is currently installing water main and will be replacing all of the water services in the project after they get the main installed.
  • Manhole Maintenance
    • Work scheduled to begin week of November 9
    • Visu-Sewer, Inc has been contracted to refurbish manholes needing maintenance due to H2S gases. 

Parks, Recreation & Forestry

  • Greenville Sports Complex
    • Construction of Schultz Farm Road is underway and will be completed in two phases, with phase two being completed in spring. Schultz Farm Road is the new entrance to the Greenville Sports Complex. It is an official Town road and will also serve as access to Well #5 and a private residence. This new road will provide a safer access to the park and includes a right turn lane and bypass lane on Hwy 96.